Little Eva
Definitive Feasibility Study (DFS)
- 
Bankable DFS by GR Engineering Services (GRES). Costs refreshed in February 2014
- 
Focused on 5 simple sulphide deposits of which Little Eva is the largest
- 
JORC 2012 compliant resources and reserves
- 
Straightforward open pit mining and simple processing for 11 years
- 
Clean copper-gold concentrate
- 
Native title, environmental permits and mining leases all in place
- 
Low capital intensity
- 
7 ‘copper-only’ deposits excluded
| Project Life | 11 years | 
| Throughput | 7million Tonnes per annum | 
| Copper Grade (excluding stock piles) | 0.6 % | 
| Gold Grade | 0.1 g/t | 
| Copper Production | 38,800 Tonnes per annum | 
| Gold Production | 17,200 Ounces per annum | 
| Capital Expenditure | AUD$294 million | 
| Life of Mine Revenue | AUD$2,931 million | 
| Project NPV (7.5% pre-tax real) | AUD$346 million | 
| Internal Rate of Return | 29% | 
| C1 Cash Cost | 1.65 US$ per pound copper | 
Little Eva is a Large Deposit
- 
Little Eva is the largest deposit, DFS includes 3 satellite deposits: Ivy Ann, Lady Clayre and Bedford
- 
Little Eva Resource: 546kt contained copper and 295koz contained gold
- 
Pit is 1.3km long, up to 370m wide, 240m deep
- 
Low strip ratio of 1.8:1 after pre-strip
- 
Reserves: 70.6Mt ore @ 0.57% copper; 0.08g/t gold
- 
Contract mining fleet delivering 7Mtpa to adjacent plant
           - Conventional drill and blast
           - 12 x 136t trucks
           - 2 x 250t excavators